Since the beginning of 2009, close to 70 employees have been assigned to the dismantling of the production equipment and materials of the C-Series, that was shutdown in the midst of the 2008 economic downturn. These activities will be ongoing until the end of 2010.
Main components to be dismantled (C-Series):
- 184 cells
- 9 500 t of steel
- 3 500 t of aluminum
- 6 100 t of carbon
- electrical equipment
|
|



 
|
|